Pumping Stations (7&8), Sewage and Agricultural Drainage Collection and Treatment Project, Dabaa Corridor
Construction
Dabaa Corridor, Egypt
PROJECT OVERVIEW
The project is turnkey construction of (2) pumping stations (P07 & P08). The pumping capacity of each station is 6.6 million m3/day.
The stations are part of a mega project for the collection and treatment of sewage and agricultural drainage with a capacity of 6 million m3/day to reclaim 362,000 fedans South of Dabaa Corridor.
SIAC's scope of works includes all civil, architectural finishing, electromechanical, infrastructure, landscape, and road works.
Owner
Ministry of Water Resources and Irrigation, Egypt
Client
Egyptian Armed Forces Engineering Authority
Engineer
Hydro., Envir. & Infra str. Studies